Services Projects Service Areas Guides Gallery About Get Estimate Call (646) 641-9475
The same wall after renovation, with full-height grey cabinetry and a veined quartz backsplash
Bayside, Queens · Apartment kitchen gut + open-concept conversion

An enclosed Bayside apartment kitchen, opened into the heart of the home.

Load-bearing walls came down, a new steel beam and bolted post went in, and the beam was dressed and left exposed rather than buried in a soffit. Three weeks on site. $68,000, fixed written proposal.

Location
Bayside, Queens
Project
Apartment kitchen gut
Time on site
Three weeks
Investment
$68,000 fixed
01

The starting point

Enclosed, dark, and full of memories.

This renovation was about more than replacing an outdated kitchen. After losing a loved one, our client was left with an apartment filled with years of belongings, keepsakes and family memories.

The original kitchen was narrow, enclosed and disconnected from the main living area. The aging built-in painted shelving offered limited, awkward storage, the finishes were worn, and a single dated ceiling fixture was doing all the lighting for the room. The dividing walls made the whole apartment feel smaller and darker than it actually was.

The original galley, narrow, enclosed and cut off from the living area.
The original galley, narrow, enclosed and cut off from the living area.
The Bayside apartment kitchen before renovation, with worn painted built-in open shelving
The same wall after renovation, with full-height grey cabinetry and a veined quartz backsplash
Before After Drag to compare
Both views look at the same run, the awkward open shelving that became the new full-height cabinetry, quartz counter and matching backsplash. Drag the handle to compare.
02

What we recommended

Clear at her pace first. Build second.

Clearing the apartment all at once would have been overwhelming, so we approached the project with patience rather than a schedule. We worked alongside her little by little, giving her the time and space to decide what she wanted to keep, donate or remove. Nothing was discarded without her approval.

That phased clearing happened over several visits before construction started. Only once she was ready did demolition begin. The construction itself was scoped separately from the clearing, with a fixed written number in front of her before anything started.

Clearing in stages, keep, donate or remove, her call every time.
Clearing in stages, keep, donate or remove, her call every time.
Containment sheeting and floor protection up before demolition began.
Containment sheeting and floor protection up before demolition began.
3
weeks on site, start to finish
1
new steel beam and bolted post
$68,000
fixed written proposal, not an estimate
0
items discarded without her approval
03

How the build ran

The beam was inside the wall we took down.

Walkthrough and fixed proposal

We walked the apartment, scoped the clearing separately from the construction, and put a fixed written number in front of her before anything started.

Client-paced clearing

Several visits sorting belongings into keep, donate and remove, her call, every time, with sentimental items set aside and protected.

Demolition and structure

The dividing walls were carrying load, and the beam holding up that side of the apartment was buried inside the one we took down. We shored the ceiling, then set a new steel beam and bolted post across the widened opening.

Rough-in and finishes

Electrical, lighting and plumbing re-run, then board, flooring, cabinetry, quartz, appliances and punch list, three weeks on site start to finish.

Temporary shoring and new framing while the opening was carried.
Temporary shoring and new framing while the opening was carried.
The dividing wall opened up, with the old structure exposed above.
The dividing wall opened up, with the old structure exposed above.
Electrical and plumbing re-run through the reframed opening.
Electrical and plumbing re-run through the reframed opening.
04

The result

Dressed up, not boxed in.

Most crews would bury the new beam in a soffit and pretend the wall was never there. We dressed it instead, steel finished dark, connection plates and bolts left in view, clean returns down the post. Structure that spent decades hidden inside a wall is now the line that frames the whole kitchen.

The waterfall quartz island sits exactly where the dividing wall used to be, with room for cooking, dining and gathering. Soft contemporary cabinetry, dramatic quartz surfaces, warm flooring and layered lighting give the space a refined but comfortable feeling. Opening the kitchen to the living area changed how the entire apartment feels: more spacious, more welcoming, and connected as one room instead of two.

05

Scope of work

  • Phased clearing: Several visits sorting belongings into keep, donate and remove, at the client's pace.
  • Demolition: Kitchen and load-bearing dividing walls removed under containment and floor protection.
  • Structure: Ceiling shored, new steel beam and bolted post set to carry the widened opening.
  • Exposed beam detail: Steel finished dark with connection plates and bolts left deliberately in view.
  • Electrical and lighting: Circuits re-run, recessed and layered lighting through the opened plan.
  • Plumbing: Supply and waste re-run to the new sink and appliance locations.
  • Cabinetry: Full-height soft contemporary grey cabinetry throughout.
  • Stone: Quartz counters, waterfall island end and full-height backsplash.
  • Flooring: Warm plank flooring carried through the kitchen and living area as one surface.
  • Appliances: New appliance package set into the reworked layout.
07

Materials & finishes

Cabinetry
Full-height, soft contemporary grey
Counters
Quartz, veined
Island
Oversized with waterfall end
Backsplash
Full-height quartz
Structure
New steel beam + bolted post, dressed and exposed
Lighting
Recessed and layered, replacing one ceiling fixture
Flooring
Warm plank, continuous
Approach
Owner-supervised, client-paced clearing
Rated 5.0 out of 5 across 25 Google reviews by homeowners across Queens and Nassau County.
Verified on Google · Read the reviews

Serving Bayside and the surrounding area.

Dream Homes Remodeling is based in Whitestone, Queens and works across Northeast Queens and Nassau County. Bayside, Queens, NY is within our regular service area.

Thinking about opening up your kitchen?

Removing a wall in a Queens apartment or co-op is a structural question first and a design question second. Before any number means anything, someone has to determine whether the wall is carrying load, what has to span the new opening, and what your building or board will require in the way of drawings and approvals.

We will walk the space, tell you honestly what the wall is doing, and give you an itemized fixed proposal, like the $68,000 written number on this job, rather than an hourly estimate that moves.

Tell us what you’re planning.

Send us the room, the address and roughly what you have in mind. We’ll come out, look at what’s actually there, and give you a real number.

Licensed & insured · Queens & Nassau County · 5.0 ★ on Google

Alex D., owner of Dream Homes Remodeling
About the builder

Every Dream Homes project runs through Alex D.

Whitestone-born. Local 45-trained carpenter. Fifteen years running Dream Homes Remodeling across Queens and Nassau County. Alex personally walks every job, plans every scope, and stands behind every finish.

“Every project is an extension of me. I won’t settle for anything less than my best.”

— Alex D.
Meet Alex →
Call Now Get Estimate