Douglaston Open-Concept Gut Renovation

The Challenge
The home was chopped into small, dark rooms with a load-bearing wall blocking the main floor, making the space feel far smaller than its footprint.
The Plan
We engineered and installed a structural beam to safely remove the load-bearing wall, gutted the main floor to the studs, rerouted mechanicals, and rebuilt with an open layout and custom millwork.
The Result
A dramatic, light-filled open-concept main floor — engineered to code, built to last, and finished with millwork that anchors the entire home.
Before & After
Before
After
Let's build your dream home.
Spots on our calendar fill fast — especially for spring and summer renovations. Lock in your in-home consultation today and get an honest, itemized estimate from a 5-star Queens contractor.